Piriapolis maintenance
13/05/11 19:45 Filed in: Uruguay | Maintenance
Another nice day.
This heavily fouled boat was hauled out by her new owner and placed ahead of Kiriwina.
The fouling hid greater problems. Most of the undewater planking is rotten and needs to be replaced.
I got on with cleaning up the prop and coupling. These will be taken to a machine shop in Montevideo for keyway cutting.
Prop details.
Prop shaft in way of failed coupling.
This heavily fouled boat was hauled out by her new owner and placed ahead of Kiriwina.
The fouling hid greater problems. Most of the undewater planking is rotten and needs to be replaced.
I got on with cleaning up the prop and coupling. These will be taken to a machine shop in Montevideo for keyway cutting.
Prop details.
Prop shaft in way of failed coupling.